Difference between revisions of "EvaluationBestPractice"

(Initial Webcast)
Line 9: Line 9:
 
= Initial Webcast =
 
= Initial Webcast =
 
(polish existing slides, add stuff required for POC)
 
(polish existing slides, add stuff required for POC)
** product positioning
+
* product positioning
** architecture overview  
+
* architecture overview  
** documentation overview
+
* documentation overview
** ProofOfConcept (POC) planning
+
* ProofOfConcept (POC) planning
*** Goal: single-server OX-installation in existing target-environment  
+
** Goal: single-server OX-installation in existing target-environment
 +
 
 
= POC Installation =
 
= POC Installation =
 
connected to existing mail-accounts and administered manually
 
connected to existing mail-accounts and administered manually

Revision as of 10:35, 29 December 2011

clever stuff

Presales-process.png


insert bla here

Preparation / Questionnaire

(insert link to questionnaire here)

Initial Webcast

(polish existing slides, add stuff required for POC)

  • product positioning
  • architecture overview
  • documentation overview
  • ProofOfConcept (POC) planning
    • Goal: single-server OX-installation in existing target-environment

POC Installation

connected to existing mail-accounts and administered manually (insert Link to article describing POC Requirements / Deliverables) 1. installed by customer

  • link to install-documentation
  • review-webcast

2. installed by OX

  • requirements
  • (remote) installation
  • handover-webcast

Evaluation Period

Feedback Webcast

(approx. 4 weeks later)