Difference between revisions of "EvaluationBestPractice"

Line 7: Line 7:
 
** documentation overview
 
** documentation overview
 
** ProofOfConcept (POC) planning
 
** ProofOfConcept (POC) planning
*** Goal: 1-server OX-installation in target-environment connected to existing mail-accounts and administered manually
+
*** Goal: single-server OX-installation in existing target-environment connected to existing mail-accounts and administered manually
 
(insert Link to article describing POC Requirements / Deliverables)
 
(insert Link to article describing POC Requirements / Deliverables)
  
Line 13: Line 13:
  
 
1. installed by customer
 
1. installed by customer
 +
* link to install-documentation
 +
* review-webcast
 +
 
2. installed by OX
 
2. installed by OX
 
* requirements
 
* requirements
Line 18: Line 21:
 
* handover-webcast
 
* handover-webcast
  
customer is able
+
* customer evaluates the product
 +
 
 +
* feedback-webcast (approx. 4 weeks later)

Revision as of 10:09, 29 December 2011

insert bla here

  • request Questionnaire (insert link here)
  • initial webcast (polish existing slides, add stuff required for POC)
    • product positioning
    • architecture overview
    • documentation overview
    • ProofOfConcept (POC) planning
      • Goal: single-server OX-installation in existing target-environment connected to existing mail-accounts and administered manually

(insert Link to article describing POC Requirements / Deliverables)

  • setup the POC

1. installed by customer

  • link to install-documentation
  • review-webcast

2. installed by OX

  • requirements
  • (remote) installation
  • handover-webcast
  • customer evaluates the product
  • feedback-webcast (approx. 4 weeks later)