Difference between revisions of "EvaluationBestPractice"
Karsten.will (talk | contribs) |
Karsten.will (talk | contribs) |
||
Line 6: | Line 6: | ||
= Preparation / Questionnaire = | = Preparation / Questionnaire = | ||
+ | (insert link to questionnaire here) | ||
= Initial Webcast = | = Initial Webcast = | ||
− | + | (polish existing slides, add stuff required for POC) | |
− | |||
− | |||
− | |||
− | |||
− | |||
** product positioning | ** product positioning | ||
** architecture overview | ** architecture overview | ||
** documentation overview | ** documentation overview | ||
** ProofOfConcept (POC) planning | ** ProofOfConcept (POC) planning | ||
− | *** Goal: single-server OX-installation in existing target-environment connected to existing mail-accounts and administered manually | + | *** Goal: single-server OX-installation in existing target-environment |
+ | = POC Installation = | ||
+ | connected to existing mail-accounts and administered manually | ||
(insert Link to article describing POC Requirements / Deliverables) | (insert Link to article describing POC Requirements / Deliverables) | ||
− | |||
− | |||
− | |||
1. installed by customer | 1. installed by customer | ||
* link to install-documentation | * link to install-documentation | ||
Line 30: | Line 25: | ||
* (remote) installation | * (remote) installation | ||
* handover-webcast | * handover-webcast | ||
− | + | = Evaluation Period = | |
− | + | = Feedback Webcast = | |
− | + | (approx. 4 weeks later) | |
− |
Revision as of 10:35, 29 December 2011
clever stuff
insert bla here
Contents
Preparation / Questionnaire
(insert link to questionnaire here)
Initial Webcast
(polish existing slides, add stuff required for POC)
- product positioning
- architecture overview
- documentation overview
- ProofOfConcept (POC) planning
- Goal: single-server OX-installation in existing target-environment
POC Installation
connected to existing mail-accounts and administered manually (insert Link to article describing POC Requirements / Deliverables) 1. installed by customer
- link to install-documentation
- review-webcast
2. installed by OX
- requirements
- (remote) installation
- handover-webcast
Evaluation Period
Feedback Webcast
(approx. 4 weeks later)